Are you planning to build a new property or upgrade your existing one in Dubai? Then, you might need to get approvals from the Dubai Electricity and Water Authority (DEWA). DEWA is responsible for providing water and electricity services to the city of Dubai.
What are DEWA approval?
DEWA approvals refer to the permits and certifications issued by Dubai Electricity and Water Authority (DEWA) for various construction, demolition, modification, infrastructure projects, and electricity or water connections. These approvals ensure that all electrical and water systems in a building meet the safety standards set by DEWA.
For instance, if you’re planning to build a property in Dubai, you need to obtain a Building Electrical No Objection Certificate from DEWA before starting any electrical work on-site. Similarly, you need to secure a Water No Objection Certificate for any water-related installations.
Moreover, DEWA also offers services related to modifying electricity or water networks. If someone wants an additional connected load or to upgrade their existing one, then they must apply for an NOC first which is an abbreviation of No Objection Certificate.
Getting these approvals can be daunting as it requires thorough knowledge of DEWA’s regulations and guidelines. However, once obtained it guarantees the safe operation of your premises’ electrical and water systems while avoiding fines imposed due to non-compliance with the law.
How to get DEWA approvals?
Obtaining DEWA approvals can be a complex and time-consuming process, but it is essential to ensure that your building, or infrastructure project meets the necessary safety standards. By understanding what DEWA approvals are and which services they offer, you will have a better idea of how to navigate the approval process.
To get started with obtaining DEWA approvals, you should first identify which type of approval you need for your project. Once you know this information, you can begin gathering the necessary documentation and filling out any required applications.
It is also important to keep in mind that timelines for obtaining DEWA approvals can vary depending on the scope of your project and other factors such as workload volume at DEWA. Therefore, plan accordingly by starting early so that there isn’t any delay during construction due to pending permits.
Working with an experienced consultant who understands the regulations and requirements associated with obtaining DEWA approvals can help streamline the process considerably while ensuring compliance from start to end successfully!
Request for Building Electrical NOC
A Building Electrical No Objection Certificate (BENOC) is a document issued by DEWA that certifies the safety and compliance of electrical systems installed in buildings. This certificate is mandatory for all new constructions, renovations, and modifications to existing electrical systems.
To obtain BENOC, you need to apply for a form along with necessary documents like floor plans, wiring diagrams, load schedules, etc. A qualified electrician must also certify the installation of electrical equipment.
DEWA may conduct inspections and tests before issuing BENOC as part of its commitment to ensuring the safe and efficient use of electricity. This process ensures that all buildings comply with applicable regulations and standards which are essential for protecting public health and safety.
Having a valid BENOC helps avoid costly delays in building projects or potential legal issues related to unsafe electrical installations. It also ensures the smooth running of daily operations without any interruptions due to electrical system failures or hazards.
In summary, obtaining a Building Electrical No Objection Certificate is crucial for ensuring safe and reliable functioning of your building’s electrical systems while remaining compliant with local regulations.
Request for Building Water NOC
A Building Water No Objection Certificate (BW-NOC) is a permit issued by Dubai Electricity and Water Authority (DEWA) that certifies that the building’s water connection complies with the authority’s regulations. To get this certification, applicants need to submit several documents, including architectural plans, plumbing designs, and other relevant certificates.
The application for BW-NOC can be submitted online through DEWA’s website or in person at their customer service centers. The processing time for this type of NOC usually takes around seven working days from the date of submission.
It is important to note that obtaining a BW-NOC is mandatory for any new construction or renovation project that involves water connections in Dubai. Failure to obtain this certificate could lead to legal consequences and hefty fines.
Getting a Building Water, No Objection Certificate might seem like a daunting task; however, it ensures compliance with DEWA regulations and guarantees safe and efficient usage of water in buildings.
Request for Upgrading the Connected Load NOC
A connected load refers to the amount of electrical power that can be supplied to a building. If you want to upgrade your connected load, you need to obtain a No Objection Certificate (NOC) from Dubai Electricity and Water Authority (DEWA).
To apply for an Upgrading the Connected Load NOC, you need to submit several documents including a completed application form, a valid trade license copy, copies of passport and visa page for non-UAE nationals, and clearance certificates from other authorities.
Once all the required documents are submitted, DEWA will review your request and conduct an inspection of your premises. They will then determine if it is feasible for them to increase your connected load capacity based on their technical assessment.
It is important to note that upgrading the connected load without obtaining the necessary approvals can result in fines or even disconnection of the electricity supply. Therefore, it is crucial that you follow proper procedures when applying for Upgrading the Connected Load NOC.
By obtaining this approval from DEWA, you can ensure that your building has sufficient electrical power supply needed for its daily operations.
Request for Additional Connected Load NOC
A connected load refers to the total power consumption of all electrical appliances and equipment that are connected to a particular supply. If you need to increase your electricity usage, you will have to apply for an additional connected load no objection certificate (NOC) from DEWA.
To begin with, it is important to understand that NOCs are necessary for obtaining approval from DEWA for any major changes or upgrades in your electricity connection. When applying for an additional connected load NOC, you will be required to provide details such as the nature of your business and the estimated amount of electricity required.
It’s worth noting that the process of getting an additional connected load NOC can take some time. You will first need to submit your application along with all relevant documents including drawings indicating where and how much extra power supply is needed. After which, DEWA will conduct a site visit before processing your request further.
Once approved, it is essential that you maintain accurate records of energy usage as well as pay close attention to existing regulations surrounding energy conservation efforts – particularly during peak times when demand on the grid is high.
Ultimately, by working closely with DEWA and understanding their requirements thoroughly throughout this process, businesses can ensure they receive sufficient power supplies while also complying with local regulations ensuring responsible use of resources.
Electrical Demolishing permits
Electrical Demolishing permits are necessary when a building or structure needs to be destroyed or removed. These permits ensure that the electrical connections and installations in the area are properly disconnected and safely handled during demolition.
To obtain an Electrical Demolishing permit, one must apply to DEWA with all relevant details of the impending demolition project. This includes information about the location, type of structure, and electrical fittings involved.
The application is then reviewed by DEWA officials who will conduct site inspections to ensure that all safety measures are being considered before granting approval for any work to begin.
It is important to note that Electrical Demolishing permits only cover electrical aspects of a demolition project. Other permits may also be required for water networks or infrastructure projects, depending on the scope of work involved.
Electrical Demolishing permits play a crucial role in maintaining public safety during construction activities. Without these approvals, there could be serious risks associated with live wires and exposed electrical equipment during the destruction processes.
Water Demolishing permits
DEWA offers water demolishing permits to individuals who wish to demolish a building or structure that is connected to DEWA’s water network. These permits are essential as they ensure the safety of the public and prevent any damage to the existing water infrastructure.
To apply for a water demolishing permit, applicants must submit an online application form along with all necessary documents required by DEWA. This includes details about the location, size, and type of building being demolished.
DEWA will then conduct an inspection of the site before approving or rejecting the application. If approved, a permit will be granted which allows for the safe removal of any connections from DEWA’s water network.
It is important to note that failure to obtain a water demolishing permit can result in serious consequences such as fines and legal action if there is any damage caused during demolition.
Obtaining proper permits for demolitions ensures safety not only for workers but also for surrounding communities and prevents unnecessary damage to vital infrastructure.
Request for Infrastructure Projects NOC
If you are planning to undertake an infrastructure project in Dubai, then one of the essential steps is to obtain a No Objection Certificate (NOC) from DEWA. The NOC certifies that your proposed project adheres to all safety standards and regulations set by DEWA.
To request Infrastructure Projects NOC, you will need to provide detailed information about your project along with necessary documents such as drawings or plans. This includes details on the scope of work, location map, estimated time frame for completion of the project, and more.
Once you have submitted all required documents and paid the applicable fees, DEWA will review your application and assess whether it meets its requirements. If everything checks out, they will issue a NOC that is valid for up to two years.
It must be noted that obtaining an Infrastructure Project NOC can be a complicated process due to its technical nature. Therefore, it is always advisable to seek professional assistance if you feel overwhelmed or unsure about how best to proceed.
Obtaining an Infrastructure Projects NOC is crucial when undertaking any infrastructure projects in Dubai as it assures compliance with DEWA’s stringent safety standards and regulations.
Getting Electricity Connections
Getting electricity connections is an essential process for every business or household. DEWA provides various services and approvals to facilitate this process, ensuring that the connection meets safety standards while being efficient and cost-effective.
To start the process, customers must submit a request online through DEWA’s website or in person at their customer happiness centers. The required documents include a copy of the premise’s title deed, a valid Emirates ID or passport copy, and other relevant documentation.
After submitting the application, DEWA will conduct an inspection to ensure compliance with safety regulations before providing approval for electricity connections.
Once approved, customers can proceed with paying any applicable fees and scheduling installation by qualified electricians.
It’s important to note that obtaining approvals for electricity connections may take some time due to the high demand from residents across Dubai. Therefore, it’s crucial for customers to plan accordingly and apply well in advance of their desired date of connection.
Getting Electricity Fit-out Connections
Getting electricity fit-out connections from DEWA is a necessary process for those who are planning to open a new commercial or residential space. It ensures that the electrical wiring and equipment of your property are safe, functional, and compliant with the regulations set by DEWA.
To get an electricity fit-out connection, you need to submit a request through the DEWA website or service center. The application should include details about your property’s location, size, and intended use. You also need to provide information about the electrical contractors who will perform the installation work.
Once you have submitted your application, DEWA will conduct an inspection of your property to ensure that it meets its safety standards. They may also ask for additional documents such as building permits or electrical plans.
After approval of your application and passing their safety inspections, you can then proceed with installing any required electrical equipment in accordance with their policies before obtaining a final connection from them.
Getting an electricity fit-out connection from DEWA may seem like a daunting task but is essential for ensuring that your building has access to a reliable power supply while keeping everyone safe.
Request for Electricity Network Modification
Request for Electricity Network Modification is a service provided by Dubai Electricity and Water Authority (DEWA) that allows customers to modify their existing electricity network connections. This service can be used by those who need to upgrade the capacity of their current electrical supply or relocate their connection.
To apply for this service, customers are required to submit an online application through DEWA’s website or through its smart app. The application should contain all the necessary details about the modification they require in their electricity network connection.
Upon receiving the request, DEWA officials will inspect the site and conduct feasibility studies before approving it. Once approved, customers can proceed with making changes in accordance with the rules and regulations set by DEWA.
It is important to note that any modifications made without prior approval from DEWA may result in penalties or even disconnection of services. Therefore, it is always advised to seek approval first before making any changes to your electricity network connection.
Request for Electricity Network Modification is a great convenience offered by DEWA that makes it easier for customers to make necessary changes without having to go through complex procedures.
Getting Solar Permits & Connections
If you are looking to install solar panels on your property in Dubai, then you will need to obtain the necessary permits and connections from DEWA. This process can seem daunting at first, but with the right guidance, it can be straightforward.
To start the process of getting solar permits and connections, you need to first apply form along with all relevant documentation. This includes details about your property, proposed solar system design, and any required approvals from other authorities.
Once your application is received by DEWA, they will review it thoroughly before providing a quote for the cost of connecting your solar system to their grid. Once this quote is accepted and payment is made, DEWA will provide final approval for the installation of your solar panels.
It’s important to note that there are certain technical requirements that must be met during installation to ensure safety and proper functioning. These include compliance with building codes and standards as well as ensuring that all equipment used is certified by relevant authorities.
Request for Water Network Modification
If you’re planning to modify the water network in your building, getting DEWA’s approval is a must. This process ensures that your modifications are safe and comply with all regulations. Here’s what you need to know about requesting Water Network Modification NOC.
Firstly, you’ll have to fill in the form along with relevant documents such as drawings and technical specifications of the proposed modification. The submission can be done online through DEWA’s website or by visiting their customer happiness centers.
DEWA will then review your application and may conduct site inspections, if necessary, before granting the NOC. It’s important to note that any modifications made without obtaining this approval could lead to penalties imposed by authorities or even accidents due to unsafe installations.
Once you receive the NOC from DEWA, it means that your proposed modification has been approved and meets all safety requirements specified by regulation. You can now proceed with implementing these changes in accordance with the specifications outlined in your NOC.
Requesting for Water Network Modification NOCs is an essential step when modifying water networks within buildings as it ensures compliance with safety standards set forth by regulatory bodies like DEWA.
Getting Water Connections
Getting Water Connections from DEWA is a straightforward process that requires the submission of certain documents online. The first step in the process is to create an account on DEWA’s website and log in using your credentials.
Once you’ve logged in, navigate to the “Services” tab, and select “Water Services”. Here you’ll find various options for submitting water-related requests, including “New Connection Request”.
Click on this option and fill out the form with accurate information about your property, such as location, plot number, and size. You’ll also need to provide contact information so that DEWA can reach out to you if necessary.
After submitting your request, it will be reviewed by DEWA’s team who will then visit your property for inspection purposes. If everything checks out, they’ll proceed with connecting the water supply to your property.
It’s important to note that getting a new water connection may take some time depending on factors such as demand in your area or any infrastructure upgrades required.




Signage Approval
The procedure of getting approval from the appropriate authorities to install and show billboards and signs throughout the emirate is known as "signage approval." Although the Roads and Transport Authority (RTA), Abu Dhabi Media Company (ADMC), and Emirates Authority for Standardization and Metrology (ESMA) are also involved, the Dubai Municipality is the primary body in charge of approving signage applications.
Interested parties or businesses must submit a filled-out application form to the Dubai Municipality's Regulatory Department together with the necessary paperwork in order to have a signboard approved in Dubai.
The municipality's Customer Service Centers or website both offer the form for download. Following receipt, the application will be examined by the regulatory department before being sent to the appropriate authority for final approval.
Which agency must provide its approval will depend on the kind of billboard or signboard that will be installed. For instance, both RTA and Dubai Municipality licenses will be needed if the signboard is to be mounted on a building. On the other hand, only RTA clearance is required if the signboard would only be seen on a car.
After receiving all necessary approvals, interested parties can start building their billboards or signboards. They must, however, make sure that these abide by all applicable laws and guidelines established by the RTA, Dubai Municipality, and other relevant agencies.
Rules For Approving Signage
A signboard can only be allowed if its size, position, kind, and content are all suitable, according to our specialists. When it comes to hoarding boards, which are often very large in size, safety is the first concern.
If adequate precautions are not taken to guarantee a secure installation, permission from the hoarding board cannot be obtained. The content must respect public decency and regional norms, as stipulated by UAE legislation.
Only names that match those on the business's DMCC Trade License are permitted for signage in Dubai. The government forbids signboards for people who are an annoyance to the nearby homes in an attempt to reduce light pollution and light-related disruption.
They must also avoid creating any fire hazards and utilize strong materials. Every electrical component needs to be protected and hidden. Details on the materials, types of lighting, and measurements must be included in the application for sign approval.
The relevant NOC from the building owner or developer is also necessary in addition to the Permit to Work. Temporary signs such as "Opening Soon" must also be permitted in Dubai. If applicable, the sign must specify which gender the business serves.
Who Requires Signage Approval?
In Dubai, permission from the Dubai Municipality is required before a sign can be erected or displayed. This comprises banners and flags hung in public areas, signs on buildings, and signage positioned on the side of the road or expressway.
Any kind of signage must be approved before it can be displayed in public, though there are few exceptions, like temporary construction signs and tiny office nameplates.
You must apply to the municipality and provide comprehensive drawings of the proposed sign in order to have signage approved in Dubai. Information on the sign's dimensions, placement, and content must be included in the application, along with the contact information of the person in charge of hanging it.
You will receive a permit to erect your sign after your application has been examined and accepted. It's crucial to remember that all signs in Dubai have to follow the city's specifications regarding their dimensions, design, and language. The municipality will not authorize signs that do not comply with these standards, and they may be removed or fined.
Different Types of Signage Requirements
Depending on the kind of sign you wish to erect, Dubai has varying procedures for signage permission. For instance, the Dubai Municipality must give its clearance before you can erect a banner sign.
The Department of Economic Development and the Dubai Municipality must both provide their consent before you can erect an illuminated sign. Additionally, different parts of Dubai have varying sign standards.
For instance, signs in residential zones are limited to a maximum size of 5 square meters. Signs in business districts can't be larger than 10 square meters. Additionally, signs in industrial locations can't be larger than 20 square meters.
Additionally, the criteria for signs vary based on their intended use. Directional signs, for instance, have to be positioned at least thirty meters apart. Additionally, it is forbidden to erect advertising signs within 100 meters of a hospital, school, or place of worship.
Design Considerations
There are a few important design factors you must take into account in order to get signs approved in Dubai. These consist of: Elevation Signage cannot be higher than three meters in Dubai. Dimensions
Signage cannot exceed 10 square meters in size. Where
Signs must be visible from the road and positioned at least two meters above the ground. Additionally, they must be positioned inside the Roads and Transport Authority's (RTA) approved advertising zone.
In Dubai, you can advertise using a variety of signs, such as flags, projection signs, hanging signs, and LED signs. Before being approved, each form of sign must fulfill a specific set of conditions.
Content
The Department of Economic Development's (DED) Advertising Regulations must be adhered to by all signage. This includes making sure that none of the signage you use is deceptive or objectionable.
A successful project in Dubai requires adherence to a number of laws around signage clearance. It's critical to understand what kinds of signage are permitted, consult an expert if necessary, and keep all necessary documentation up to date.
By according to these criteria, you may stay in compliance with local laws and regulations and ensure that your signage permission is received without any problems.